Construction of a 3 million gallon tank, 20’ source junction tank and modification to two existing tanks at the corner of South 1950 East and East 400 South Springville, Utah 84663. Work will include mass excavation of existing site, tank construction, backfill, grading and installation of piping from new tank to tie into existing piping systems.